Lighting Power Density: Watts per Square Metre
Lighting power density (LPD) is the installed lighting load divided by floor area, in watts per square metre. Energy codes such as ECBC 2017 set maximum LPD values by building type, so the lighting design has to hit its lux targets within a power budget.
By Dhruv Agarwal · · 1 min read
Why it matters
LPD is where lighting design meets the energy code. A scheme can look fine on a lux plot and still fail compliance if it uses too much power to get there.
How it works in practice
| Factor | Effect on LPD |
|---|---|
| Fitting efficacy | Higher lumens per watt lowers LPD |
| Optics | Better light distribution needs fewer fittings |
| Target lux | Higher targets need more power |
| Controls | Reduce energy used, often credited by codes |
Common mistakes
- Adding fittings to fix dark spots. Improve layout and optics first.
- Over-lighting circulation. Corridors do not need desk-level lux.
- Ignoring daylight. Perimeter zones can be dimmed for much of the day.
Standards referenced
Lighting power density under ECBC 2017. Illumination levels under IS 3646.
Standards referenced
Frequently asked
Generally no — efficient LED fittings make LPD limits achievable for most offices. The limit mainly stops a design that solves every dark area by adding more fittings, and it rewards good optics and layout.
Yes. Daylight-linked dimming near windows and occupancy sensing in meeting rooms and toilets reduce actual energy use, and codes often credit them.
Related
More in Glossary
- Low-E Glass: Coated Glass That Controls Heat
- NRC Rating: How Much Sound a Surface Absorbs
- Purlins and Girts: The Secondary Steel of a PEB
- Raft vs Pile Foundation: How Soil Decides