Workplace Strategy & Space Planning

Workplace strategy and space planning is the pre-design stage that tests, through test fits and density studies, how many people, cabins and meeting rooms a floor can actually hold. It works from carpet area rather than chargeable area, and checks occupant load, exits and travel distance under NBC 2016 Part 4.

By Dhruv Agarwal · · 2 min read

What we deliver

Test fits, space planning and workplace strategy — the work that happens before design, and that determines whether the office you build actually suits how your people work.

Our founder wrote the first book on workplace strategy, which is a fair signal of how seriously we treat this stage. It is also the cheapest place on a project to change your mind: moving a cabin on a test fit costs nothing, moving it after the ceiling has closed costs a fortnight.

Scope of works

StageWhat we deliver
BriefHeadcount, growth plan, working patterns, meeting culture
Floor assessmentCore position, column grid, usable carpet area, daylight
Test fitTwo or three layout options against real headcount
Density studySeats per carpet area, circulation widths, support ratios
Compliance checkOccupant load, exits and travel distance to NBC 2016 Pt 4
Adjacency planningTeam placement, noise zoning, meeting room distribution
OutputAgreed layout that design and costing both work from

The numbers that actually govern

ConsiderationWhy it constrains the plan
Carpet areaThe only real denominator — never chargeable area
Circulation widthMain routes and escape widths are code-driven, not stylistic
Occupant loadMore people means more exit width under NBC 2016 Pt 4
Meeting room ratioUsually the first thing that is under-provided
Cabin countDrives partition, ceiling, sprinkler and HVAC cost
Daylight depthDeep floor plates need lighting strategy, which hits ECBC

Where projects go wrong

  • Planning headcount from the leased area. Chargeable area overstates capacity by the whole loading factor — often 25-40%.
  • Test fit skipped before lease signing. The most expensive avoidable mistake in the whole process.
  • Under-providing meeting rooms. The complaint that surfaces first in every post-occupancy review.
  • Adding cabins after the layout is costed. Each one carries ceiling, sprinkler, diffuser and lighting rework behind it.
  • Ignoring the compliance consequence of density. Occupant load, exit width and travel distance all move as the plan gets denser.

Why Hagerstone

Planning tied to delivery. We plan floors we then build, so a layout is never proposed that quietly costs a fortune in MEP rework — the team that has to reroute the sprinkler is in the room when the cabin is drawn.

Single-partner execution through to handover, on a 60-day delivery model with a 5-year warranty.

Standards referenced

Occupant load, exit width and travel distance under NBC 2016, Part 4. Lighting power density under ECBC 2017.

Standards referenced

  • NBC 2016, Part 4 — Occupant load, exits and travel distance (Bureau of Indian Standards)
  • ECBC 2017 — Lighting power density (Bureau of Energy Efficiency)

Frequently asked

It follows from carpet area, not chargeable area, and from your mix of open desks, cabins and meeting rooms. Indian corporate offices commonly plan somewhere between 60 and 100 sq ft of carpet per person once circulation, meeting rooms and support areas are counted. Denser than that starts to fail on circulation width and air changes rather than on desk space. The honest answer comes from a test fit, not a rule of thumb.

A test fit is a rough layout drawn on the actual floor plate before you commit, showing whether your headcount, cabins and meeting rooms genuinely fit. It routinely changes the leasing decision — a floor that looks large enough on a brochure can lose badly to core position, column grid or an awkward shape. Doing it before signing costs a few days; discovering it afterwards costs a lease term.

Substantially, and mostly through knock-ons rather than the partitions themselves. Every cabin wall means ceiling cut and re-formed, sprinklers relocated, a diffuser moved and a lighting circuit changed. A cabin-heavy layout can cost meaningfully more per square foot than an open-plan one on the same floor with the same finishes.

Related

More in Interior Fit-Out

All Interior Fit-Out →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback