Workplace Strategy & Space Planning

By Dhruv Agarwal · · 2 min read

What we deliver

Test fits, space planning and workplace strategy — the work that happens before design, and that determines whether the office you build actually suits how your people work.

Our founder wrote the first book on workplace strategy, which is a fair signal of how seriously we treat this stage. It is also the cheapest place on a project to change your mind: moving a cabin on a test fit costs nothing, moving it after the ceiling has closed costs a fortnight.

Scope of works

StageWhat we deliver
BriefHeadcount, growth plan, working patterns, meeting culture
Floor assessmentCore position, column grid, usable carpet area, daylight
Test fitTwo or three layout options against real headcount
Density studySeats per carpet area, circulation widths, support ratios
Compliance checkOccupant load, exits and travel distance to NBC 2016 Pt 4
Adjacency planningTeam placement, noise zoning, meeting room distribution
OutputAgreed layout that design and costing both work from

The numbers that actually govern

ConsiderationWhy it constrains the plan
Carpet areaThe only real denominator — never chargeable area
Circulation widthMain routes and escape widths are code-driven, not stylistic
Occupant loadMore people means more exit width under NBC 2016 Pt 4
Meeting room ratioUsually the first thing that is under-provided
Cabin countDrives partition, ceiling, sprinkler and HVAC cost
Daylight depthDeep floor plates need lighting strategy, which hits ECBC

Where projects go wrong

  • Planning headcount from the leased area. Chargeable area overstates capacity by the whole loading factor — often 25-40%.
  • Test fit skipped before lease signing. The most expensive avoidable mistake in the whole process.
  • Under-providing meeting rooms. The complaint that surfaces first in every post-occupancy review.
  • Adding cabins after the layout is costed. Each one carries ceiling, sprinkler, diffuser and lighting rework behind it.
  • Ignoring the compliance consequence of density. Occupant load, exit width and travel distance all move as the plan gets denser.

Why Hagerstone

Planning tied to delivery. We plan floors we then build, so a layout is never proposed that quietly costs a fortune in MEP rework — the team that has to reroute the sprinkler is in the room when the cabin is drawn.

Single-partner execution through to handover, on a 60-day delivery model with a 5-year warranty.

Standards referenced

Occupant load, exit width and travel distance under NBC 2016, Part 4. Lighting power density under ECBC 2017.

Standards referenced

  • NBC 2016, Part 4Occupant load, exits and travel distance
  • ECBC 2017Lighting power density