Pantry and Cafeteria Fit-Out: Services Decide the Position

Pantries and cafeterias are positioned by services, not by layout preference. They need drainage with continuous fall to an existing stack, extract to outside, water supply, and concentrated power — and of those, drainage is usually the constraint that fixes the location before any other consideration.

By Dhruv Agarwal · · 2 min read

Find the stacks before drawing the plan

The usual process is backwards: the layout is designed, a pantry is placed where it suits the plan, and the services team is then asked to serve it.

The order that works is to establish where existing soil and waste stacks are, where extract can be routed, and where water and power can reasonably reach — and to place wet areas accordingly. Everything else on a floor is more flexible than drainage.

The four services, in order of constraint

ServiceWhy it constrainsFlexibility
DrainageGravity; needs fall to an existing stackVery low
ExtractMust route through the building and dischargeLow
Water supplyPressurised, routes reasonably freelyModerate
PowerConcentrated load; needs a dedicated circuitModerate

Drainage is almost always the binding constraint. Floor build-up available for a fall is limited, and a long run either runs out of fall or needs pumping — which introduces equipment, noise, maintenance and something that can fail while nobody is watching.

Plumbing provisions sit in NBC 2016, Part 9, with ventilation in NBC 2016, Part 8 and ventilation rates commonly referenced to ASHRAE 62.1.

Name what you are actually building

Tea pointPantryCafeteria with cooking
Water and sink drainageYesYesYes, plus floor drainage
RefrigerationSometimesYesYes, larger
ExtractMinimalModerateSubstantial, with grease management
PowerModestConcentratedHeavy, or gas
Back of houseNoneSmallPreparation, storage, wash-up, waste
Fire considerationsStandardStandardSuppression and dampers likely

Briefs frequently say "pantry" and mean "cafeteria". The services difference is large, and it is better established at brief stage than during coordination.

What consumes the area

A cafeteria brief given as a seat count understates the space required. Also needed:

  • Servery and queuing space, which backs up at peak
  • Circulation between tables that people can actually pass through
  • Back-of-house preparation and storage
  • Wash-up and equipment space
  • Waste storage and its removal route
  • Sometimes a separate route for deliveries

And the sizing driver is peak usage, not headcount — a single lunch sitting needs far more seats than a staggered one, so the operating pattern belongs in the brief.

Construction details that matter

  • Impervious, slip-resistant flooring, with coved junctions at walls in wet areas
  • Falls to drainage designed into the screed wherever the floor is washed
  • Waterproofing beneath wet areas, properly detailed at upstands
  • Ventilation sized for the space's actual use, not the general office rate
  • Acoustic treatment — hard, cleanable surfaces make these rooms loud, and a noisy cafeteria empties quickly
  • Access to isolation valves, traps and equipment for maintenance

Standards referenced

Plumbing provisions, including water supply and drainage, in NBC 2016, Part 9; ventilation provisions in NBC 2016, Part 8; ventilation rates commonly referenced to ASHRAE 62.1; fire and life safety provisions in NBC 2016, Part 4. Drainage design, extract routing, ventilation rates and any fire requirements for a specific facility must be established by the project's consultants and the authority having jurisdiction.

Standards referenced

  • NBC 2016, Part 9 — Plumbing services — water supply and drainage
  • NBC 2016, Part 8 — Building services — ventilation
  • NBC 2016, Part 4 — Fire and life safety
  • ASHRAE 62.1 — Ventilation for acceptable indoor air quality