Turbo Ventilators — Wind Driven Roof Extraction
A turbo ventilator is a wind-driven rotating turbine mounted on a roof that extracts warm, stale air from the space below without electrical power, helped by hot air rising inside the building. It gives continuous background extraction with no running cost, but cannot guarantee an extraction rate, so it is no substitute for powered extraction or designed smoke vents.
By Dhruv Agarwal · · 1 min read
What it is
A wind-driven rotating turbine mounted on a roof, extracting warm stale air from the space below without electrical power.
Specification at a glance
| Property | Typical specification |
|---|---|
| Throat diameter | 300mm, 450mm, 600mm common |
| Material | Aluminium, or stainless for corrosive air |
| Bearings | Sealed, maintenance-free, quality critical |
| Base | Profiled to match the roof sheet |
| Flashing | Upstand and dressed flashing, not mastic |
| Damper | Optional, for cold or dusty conditions |
How they earn their place
No running cost and no power supply, which suits large sheds where extraction is desirable but ducted powered systems would be expensive to run.
Continuous background extraction, removing accumulated heat that otherwise builds under the roof through the day.
Simple, with nothing to fail except the bearings.
Where they are not sufficient
| Requirement | Use instead |
|---|---|
| Guaranteed extraction rate | Powered extraction fans |
| Smoke management / fire strategy | Designed smoke vents |
| Process fume or dust extraction | Ducted extraction at source |
| Conditioned space | Sealed envelope, mechanical ventilation |
Where projects go wrong
- Base sealed with mastic instead of properly flashed. It leaks.
- Quantity guessed rather than calculated from required air changes.
- Cheap bearings that seize within a couple of years, after which the unit is just a hole in the roof.
- Used in a fire strategy where designed smoke vents are required.
- No damper in dusty locations, so dust and driven rain enter when the turbine is still.
Standards referenced
Ventilation provisions under NBC 2016, Part 8. Wind loading on roof-mounted items under IS 875 (Part 3). Envelope and ventilation requirements under ECBC 2017.
Standards referenced
- NBC 2016, Part 8 — Building services — ventilation (Bureau of Indian Standards)
- IS 875 (Part 3) — Wind loads on buildings (Bureau of Indian Standards)
- ECBC 2017 — Building envelope and ventilation (Bureau of Energy Efficiency)
Frequently asked
Related
More in Materials
- Undercut Anchors for Stone and Porcelain Cladding
- UPVC Pipe for Cold Water and Drainage
- Vinyl Flooring — LVT, Homogeneous and Heterogeneous
- Vitrified Tile — Full Body, GVT and Double Charge