Daylight Factor: How Much Daylight Reaches Into a Floor
Daylight factor is the ratio of indoor daylight illuminance at a point to the outdoor illuminance under an overcast sky, expressed as a percentage. It describes how much of the available daylight reaches a given position, so it falls sharply as you move away from a window and is a useful way to judge how deep a floor plate can usefully be daylit.
By Dhruv Agarwal · · 2 min read
Why it matters on a project
Daylight is the thing occupants respond to most strongly and the thing fit-out decisions most often destroy without anyone noticing.
Daylight factor is useful because it makes the loss measurable. It shows how far into the plate daylight usefully reaches, which in turn tells you where enclosed rooms can sit without cost, and where they will darken the whole floor behind them.
What raises and lowers it
| Raises daylight factor | Lowers it |
|---|---|
| Larger glazed area | Deep floor plate |
| Higher window head height | Low window heads |
| Higher glass light transmission | Heavily tinted or reflective glass |
| Light internal surfaces | Dark ceilings and walls |
| Clear sky view | External obstructions, adjacent buildings |
| Open layout near the facade | Cabins along the window line |
The head-height point is underused
Two windows of the same area do not daylight a room equally. Light entering high travels deeper. A tall window daylights a deeper band than a wide, low one of the same glazed area.
That has a direct fit-out consequence: dropping the ceiling near the facade, or running a deep bulkhead along the window line, cuts the top of the window and removes the part doing the most work. It is a common casualty of services coordination, and it is worth defending.
What it does not tell you
Daylight factor is defined against an overcast sky. That makes it comparable and stable, but it says nothing about:
- Direct sun and glare at particular hours and orientations
- Solar heat gain, which is SHGC
- Seasonal and daily variation
- Whether blinds will end up permanently closed
So it answers "how deep does daylight reach", not "is this a comfortable place to sit". Both questions matter.
Interior illumination practice is set out in IS 3646, with lighting and daylighting control provisions in ECBC 2017 and building services in NBC 2016, Part 8.
Common mistakes
- Lining the facade with enclosed rooms. The most damaging daylight decision available at fit-out stage.
- Cutting the top of the window with a bulkhead or dropped ceiling. Removes the most effective part of the aperture.
- Optimising glass for solar control alone. A dark facade moves energy from cooling to lighting.
- Daylight with no lighting control. No daylight strategy saves energy if the lights do not respond.
- Treating daylight factor as a comfort measure. It does not describe glare or direct sun.
Standards referenced
Interior illumination practice in IS 3646; lighting, control and daylighting provisions in ECBC 2017; building services provisions in NBC 2016, Part 8. Daylight analysis and compliance for a specific building must be established by the project's lighting or energy consultant.
Standards referenced
- IS 3646 — Code of practice for interior illumination (Bureau of Indian Standards)
- ECBC 2017 — Lighting and controls — daylighting (Bureau of Energy Efficiency)
- NBC 2016, Part 8 — Building services — lighting and ventilation (Bureau of Indian Standards)
Frequently asked
Related
More in Glossary
- Defects Liability Period: What It Covers and What It Does Not
- IP Rating: Reading the Two Digits Correctly
- Lux Level: The Number That Does Not Describe Good Lighting
- Movement Joint: Where a Building Is Allowed to Move