Turnkey Commercial Construction
Turnkey commercial construction delivers a commercial building from groundwork to a ready-to-occupy handover under one contract, covering foundations, structure, masonry, finishes, facade, MEP and interiors. Its main advantage is that trade interfaces are planned on one programme, since most delays and disputes arise at handovers between separate contractors.
By Dhruv Agarwal · · 1 min read
What we deliver
Commercial buildings from groundwork to handover — foundations, structure, masonry, finishes, facade, MEP and interiors delivered as a single turnkey scope.
Hagerstone describes this work as from structure to splendour: the same organisation takes a building from its foundations to a finished interior. That is what makes speed possible — the programme is planned end to end rather than stitched together from separate contracts.
Scope of works
| Stage | What we deliver |
|---|---|
| Planning | Programme, sequencing, procurement plan |
| Groundwork | Excavation, foundations, plinth |
| Structure | RCC frame or PEB, slabs, staircases |
| Masonry & finishes | Blockwork, plaster, flooring, painting |
| Envelope | Facade, glazing, cladding, doors and windows |
| Services | Electrical, HVAC, plumbing, firefighting, ELV |
| Interiors | Fit-out, joinery, furniture |
| Handover | Testing, snagging, documentation |
What drives the cost
Building size and height · structural system — RCC or PEB · foundation type, which depends on the soil · facade specification · MEP complexity · interior specification · programme compression · site access and logistics.
Where projects go wrong
- Design not frozen before construction. Every change during construction costs more than the same change on paper.
- Soil conditions assumed. Foundation design depends on a proper soil investigation.
- Trades contracted separately. The interfaces between them are where time and money are lost.
- Long-lead items ordered late. Facade, lifts and major MEP plant can govern the programme.
- Approvals not in the programme. Statutory clearances sit outside the site's control.
Why Hagerstone
Single-partner execution — civil, PEB, facade, MEP and interiors under one integrated team, on a 60-day delivery model with a 5-year warranty.
350+ professionals with trades in-house, including a 53-member site team, under ISO 9001 / 14001 / 45001 and 79+ quality checkpoints, with a dedicated CRM as the client's single point of contact.
Standards referenced
Building design and construction under the National Building Code of India 2016. Reinforced concrete to IS 456:2000.
Standards referenced
- NBC 2016 — National Building Code of India (Bureau of Indian Standards)
- IS 456:2000 — Plain and reinforced concrete — code of practice (Bureau of Indian Standards)
Frequently asked
Related
More in Construction
- Excavation and Earthworks: The Ground Decides the Cost
- Site Development and External Works: The Part Priced Last and Needed First
- Structural Repair and Retrofit: Assessing Before Strengthening
- Industrial Flooring and Hardstanding: Designing for What Runs On It