Turnkey Commercial Construction

Turnkey commercial construction delivers a commercial building from groundwork to a ready-to-occupy handover under one contract, covering foundations, structure, masonry, finishes, facade, MEP and interiors. Its main advantage is that trade interfaces are planned on one programme, since most delays and disputes arise at handovers between separate contractors.

By Dhruv Agarwal · · 1 min read

What we deliver

Commercial buildings from groundwork to handover — foundations, structure, masonry, finishes, facade, MEP and interiors delivered as a single turnkey scope.

Hagerstone describes this work as from structure to splendour: the same organisation takes a building from its foundations to a finished interior. That is what makes speed possible — the programme is planned end to end rather than stitched together from separate contracts.

Scope of works

StageWhat we deliver
PlanningProgramme, sequencing, procurement plan
GroundworkExcavation, foundations, plinth
StructureRCC frame or PEB, slabs, staircases
Masonry & finishesBlockwork, plaster, flooring, painting
EnvelopeFacade, glazing, cladding, doors and windows
ServicesElectrical, HVAC, plumbing, firefighting, ELV
InteriorsFit-out, joinery, furniture
HandoverTesting, snagging, documentation

What drives the cost

Building size and height · structural system — RCC or PEB · foundation type, which depends on the soil · facade specification · MEP complexity · interior specification · programme compression · site access and logistics.

Where projects go wrong

  • Design not frozen before construction. Every change during construction costs more than the same change on paper.
  • Soil conditions assumed. Foundation design depends on a proper soil investigation.
  • Trades contracted separately. The interfaces between them are where time and money are lost.
  • Long-lead items ordered late. Facade, lifts and major MEP plant can govern the programme.
  • Approvals not in the programme. Statutory clearances sit outside the site's control.

Why Hagerstone

Single-partner execution — civil, PEB, facade, MEP and interiors under one integrated team, on a 60-day delivery model with a 5-year warranty.

350+ professionals with trades in-house, including a 53-member site team, under ISO 9001 / 14001 / 45001 and 79+ quality checkpoints, with a dedicated CRM as the client's single point of contact.

Standards referenced

Building design and construction under the National Building Code of India 2016. Reinforced concrete to IS 456:2000.

Standards referenced

  • NBC 2016 — National Building Code of India (Bureau of Indian Standards)
  • IS 456:2000 — Plain and reinforced concrete — code of practice (Bureau of Indian Standards)

Frequently asked

Everything from groundwork to a building ready to occupy — foundations and structure, masonry and finishes, facade, MEP services, and interiors — under one contract and one programme. The value is not only convenience: most delays and disputes on construction projects happen at the handover between separate contractors, and turnkey removes those handovers.

Our delivery model targets 60 days for end-to-end execution, and one client describes the entire building construction being completed within 60 days. Achievable speed depends on the building's size and complexity, design freeze, approvals and material procurement — a building where those are settled before site work starts moves far faster than one where they are resolved as it goes.

Because the trades depend on each other. Structure determines where services can run; the facade depends on the slab edges; interiors depend on the MEP. When one team plans all of them, the openings, the tolerances and the sequence are resolved on the drawing. When they are separate, they are resolved on site, at the client's cost.

Related

More in Construction

All Construction →

Planning an office or commercial project?

Tell us what you are planning. Message our team on WhatsApp, call us, or leave your number and we will call you back.

Request a callback