Design Studies

Real layout options, floor plans and 3D views from our design studio — offices, plant buildings, a staff canteen, a sales centre and residences. What each plate takes, what changes as the numbers rise, and the finishes behind each option. Clients are not named.

Board room with a white boat-shaped table, ring pendants and full-height timber panelling
Concept study

Small Office Design: Board Room, MD Cabin and One Workstation Run

A design study for a small single-floor office: one workstation run of 28 ft, a supervisor's desk, a 10 ft MD cabin and a 14 ft board room, with passages between 4 ft and 6 ft 5 in. When an office has only four rooms, each one has to carry more than its own function — and the board room carries the most.

Read the study →
Office reception counter in timber and stone with a fluted dark panel behind
Concept study

Corporate Office Design Across Two Floors of a Gurugram Tower

A two-floor corporate office design study in a Gurugram tower. Both floors repeat one plan logic — cabins along the glazed edge, departments in the middle, services at the core — and every principal room is drawn to elevation level, with each wall's panelling, veneer and beading specified before anything is built.

Read the study →
Industrial canteen building in brick with a metal roof and a glazed entrance
Concept study

Industrial Canteen Design: A 200-Seat Workers' Hall and a 120-Seat Staff Hall

A design study for a standalone canteen building on a manufacturing site: a 200-seat workers' hall with fixed benches, a 120-seat staff hall with loose furniture, a 16-seat directors' room, and behind the servery a kitchen, chapati and burning areas, store, pot wash and plate return. A canteen is planned as a flow, not as a room with tables in it.

Read the study →
Office cafeteria with long tables, coloured chairs and a terracotta wall of ceramic plates
Concept study

Pharmaceutical Company Office Design Across Two Floors

A two-floor office design study for a pharmaceutical company. The ground floor takes arrival, meetings and the documentation the business runs on; the upper floor takes the cabins, the workstation blocks and a 40-seat cafeteria. Both floor plans are published here, along with the board room, calling pods, breakout and washroom views.

Read the study →
Open-plan office workstations in a long bay with glazed cabins along one side
Concept study

Plant Office Design: Three Floors for a Manufacturing Company

A design study for the office block inside a manufacturing plant, stacked over three floors: visitors, dispatch and a meeting room at ground level; the conference room, discussion room, war room and management cabins on the first; the canteen, training room and breakout on the second. A plant office is planned around production, not around a lobby.

Read the study →
Cafe seating in a sales lounge with a statement chandelier and full-height glazing
Concept study

Sales Experience Centre Design for a Residential Developer

A design study for a residential developer's sales experience centre: a cafe-style waiting lounge, four meeting spaces from a three-seat nook to a twelve-seat conference room, a sales head's cabin and nine sales desks — every room sized on plan and given its own lighting design, because this is a building whose only job is to close a sale.

Read the study →
Office reception desk and visitor lounge with stone flooring and full-height glazing
Concept study

NBFC Head Office Design: Three Layout Options, 68–204 Seats

A concept design study for an NBFC head office in Netaji Subhash Place, New Delhi. Three options were planned on the same floor plate: the interior study seats 170 at desks, while the source layouts push to between 190 and 204, and each option trades circulation and amenity against desk count.

Read the study →

Have a floor plate and a headcount?

Send us the floor plan and the number of people you are planning for, and our design team will lay out the options the same way — with the trade-offs set out before anything is priced.

Talk to the design team