# Residential Developments — Doors, Windows, Facade and Railings

> For residential towers, envelope work means aluminium doors and windows, railings and facades repeated across hundreds of units. Because the same element repeats floor after floor, fabrication accuracy, water tightness at height and installation pace decide the quality buyers see.

## What residential developers need

Residential towers are defined by repetition. The same window, door and railing
repeat across hundreds of units and dozens of floors, so fabrication accuracy,
water tightness at height and installation pace set the quality buyers see —
and the snag list the developer has to close before handover.

## What we deliver for residential

| Scope | What it covers |
| --- | --- |
| [Aluminium doors & windows](/services/facade-glazing/aluminium-doors-and-windows) | Imported and system fenestration |
| [Railings](/services/facade-glazing/railings) | SS, aluminium and glass balustrades |
| [Curtain wall](/services/facade-glazing/curtain-wall-systems) | Podium and amenity glazing |
| [Cladding](/services/facade-glazing/cladding-systems) | Tower and podium cladding |

## Delivered work

| Project | Scope | Quantity |
| --- | --- | --- |
| M3M, Sector 79 | Aluminium & glass doors and windows | 28,000 sq. ft. |

## Facade leadership experience

Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering),
has led delivery on projects including:

| Project | Scope | Quantity |
| --- | --- | --- |
| Krisumi Waterfall Residences, Sector 36A | Imported aluminium doors & windows + SS railing | 13,871 sq. m. + 7,107 r. m. |
| Adani Samsara Vilasa, Sector 60 | Imported aluminium doors & windows | 6,398 sq. m. |

## Why Hagerstone for residential

**In-house fabrication** — approximately 9,000 sq. ft. with 10,000+ sqm per month
capacity — and a system partner, Winda Window Systems, for engineered
aluminium and uPVC fenestration.

## Standards referenced

Wind loading on high-rise fenestration to **IS 875 (Part 3)**. Safety glass to
**IS 2553 (Part 1)**.

## Frequently asked questions

### What do premium residential developers need from a facade contractor?

Consistency across hundreds of identical openings, weather tightness on high floors, and a programme that keeps pace with the structure. Fenestration on a residential tower is highly repetitive, so fabrication quality and installation discipline decide whether every unit performs the same.

### Which residential projects has Hagerstone delivered?

Aluminium and glass door and window work for M3M in Sector 79, Gurugram. Our Director – Facade, Akhilesh Kumar Singh, has also led imported aluminium doors and windows and SS railing at Krisumi Waterfall Residences, Sector 36A Gurgaon, and imported aluminium doors and windows at Adani Samsara Vilasa, Sector 60 Gurgaon.

## Sources

- [IS 875 (Part 3)](https://standards.bis.gov.in/website/published-standards/department-wise) — Wind loads on buildings
- [IS 2553 (Part 1)](https://standards.bis.gov.in/website/published-standards/department-wise) — Safety glass — architectural

---

Source: https://hagerstone.com/industries/residential-developments