# Factories & Manufacturing — PEB, Civil, MEP and Envelope

> Factory construction delivers a building around a manufacturing process: structure, civil works, insulated envelope, MEP and firefighting. Floor loads, clear heights, crane capacity and utilities come from the process layout, and the building has to be ready when the machinery arrives.

## What manufacturers need

A factory serves a process and a start-of-production date. The building has to
match the process layout — floor loads, clear heights, crane capacity, utilities
and ventilation — and it has to be ready when the machinery arrives.

## What we deliver for industry

| Scope | What it covers |
| --- | --- |
| [PEB buildings](/services/peb/peb-industrial-buildings-and-warehouses) | Production sheds and warehouses |
| [Industrial construction](/services/construction/industrial-and-factory-construction) | Admin blocks, foundations, floors |
| [Roofing & cladding](/services/peb/peb-roofing-and-wall-cladding) | Insulated envelopes |
| [Electrical HT/LT](/services/mep/electrical-works-ht-lt) | Plant power distribution |
| [Firefighting](/services/mep/firefighting-systems) | Hydrant, sprinkler, pump room |

## Delivered work

| Project | Scope |
| --- | --- |
| Consern Pharma, Focal Point Ludhiana | Industrial project |
| Auma India and MinebeaMitsumi, Peenya | Manufacturing-adjacent projects |

## Facade leadership experience

Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering),
has led delivery on projects including:

| Project | Scope |
| --- | --- |
| Anygraphics Factory, Noida | PIR panel, rock wool panel and semi-unitised structural glazing, 6,500 sq. m. |
| Dee Development, Bhuj | Admin block glazing & ACP cladding, 25,000 sq. ft. |

## Why Hagerstone for industry

**Single-partner execution** across PEB, civil, MEP and interiors, with 15
welders, 15 fitters, a 35-member firefighting team and a 53-member site team
in-house, under ISO 9001 / 14001 / 45001.

## Standards referenced

Industrial occupancy fire and life safety under **NBC 2016, Part 4**. Steel
design to **IS 800:2007**.

## Frequently asked questions

### Can you deliver the whole factory, not just one package?

Yes. We deliver PEB production buildings, RCC admin blocks, insulated envelopes, electrical including HT/LT panels, firefighting and plant MEP, and office interiors — under one contract, so foundations, steel and services follow a single programme.

### Do you work in industrial estates outside the metros?

Yes. Hagerstone has worked across 25+ cities, including industrial locations such as Manesar, Rajpura, Dera Bassi, Kotputli, Nalagarh and Bhuj, as well as the Peenya industrial area in Bengaluru and the Focal Point estates in Ludhiana.

## Sources

- [NBC 2016, Part 4](https://www.bis.gov.in/standards/national-building-code/?lang=en) — Fire and life safety — industrial occupancy
- [IS 800:2007](https://standards.bis.gov.in/website/published-standards/department-wise) — General construction in steel — code of practice

---