# Golf Course Extension, New Gurugram & Dwarka Expressway

> Golf Course Extension Road, New Gurugram and the Dwarka Expressway corridor are where most of Gurugram's new premium residential and mixed-use towers have been built. Work here is dominated by high-rise envelopes: aluminium doors and windows, railings and facades.

## About these sectors

The Golf Course Extension Road, New Gurugram and the Dwarka Expressway corridor
are where most of Gurugram's new premium residential and mixed-use towers have
been built over the last decade. The work here is dominated by high-rise
fenestration, balcony railings, podium glazing and facades for large developers.

## Delivered work

| Project | Location | Scope | Quantity |
| --- | --- | --- | --- |
| M3M | Sector 79 | Aluminium & glass doors and windows | 28,000 sq. ft. |

## Facade leadership experience

Our Director – Facade, Akhilesh Kumar Singh (25+ years in facade engineering),
has led delivery on projects including:

| Project | Location | Scope | Quantity |
| --- | --- | --- | --- |
| Krisumi Waterfall Residences | Sector 36A | Imported aluminium doors & windows + SS railing | 13,871 sq. m. + 7,107 r. m. |
| Adani Samsara Vilasa | Sector 60 | Imported aluminium doors & windows | 6,398 sq. m. |
| Broadway Service Apartment | Sector 83, Dwarka Expressway | Curtain wall glazing, aluminium doors & windows | 10,550 sq. m. |

## Authorities a project clears

| Area | Authority |
| --- | --- |
| Municipal | Municipal Corporation Gurugram (MCG) |
| Development | GMDA & HSVP |
| Fire NOC | Haryana Fire & Emergency Services |
| Electricity | DHBVN |

## What projects here need

- **Repetition at quality** — hundreds of identical openings that must all perform.
- **Wind loading at height** — upper-floor fenestration and railings are designed
  for the building's wind pressure, not a standard detail.
- **Pace matched to the structure** — installation that keeps up with a tower
  going up floor by floor.

## Services we deliver here

[Aluminium doors & windows](/services/facade-glazing/aluminium-doors-and-windows) ·
[Railings](/services/facade-glazing/railings) ·
[Curtain wall](/services/facade-glazing/curtain-wall-systems) ·
[Gurugram overview](/locations/gurugram)

## Frequently asked questions

### Which projects has Hagerstone delivered in these sectors?

Aluminium and glass doors and windows for M3M, Sector 79. Our Director – Facade, Akhilesh Kumar Singh, has also led imported aluminium doors and windows plus SS railing at Krisumi Waterfall Residences, Sector 36A; imported aluminium doors and windows at Adani Samsara Vilasa, Sector 60; and curtain wall glazing with aluminium doors and windows at Broadway Service Apartment, Sector 83 on the Dwarka Expressway.

### Why is fenestration so important on these projects?

These are largely high-rise residential and serviced-apartment towers where the same window, door and railing repeat across hundreds of units. Water tightness on upper floors, consistent fabrication and installation pace decide both buyer experience and the developer's snag list.

## Sources

- [IS 875 (Part 3)](https://standards.bis.gov.in/website/published-standards/department-wise) — Wind loads on buildings
- [IS 2553 (Part 1)](https://standards.bis.gov.in/website/published-standards/department-wise) — Safety glass — architectural

---

Source: https://hagerstone.com/estates/new-gurugram-sectors
