# Focal Point, Ludhiana — Industrial Construction and Services

> Ludhiana's Focal Point estates are the city's main organised industrial areas, developed by PSIEC for manufacturing such as engineering goods, auto components, textiles and hosiery. Projects here are industrial buildings, admin blocks and plant services.

## About Focal Point

Ludhiana's Focal Point estates are the city's main organised industrial areas,
developed by PSIEC to house the manufacturing that makes Ludhiana Punjab's
industrial capital — engineering goods, auto components, textiles and hosiery,
and pharma. Most projects are factory buildings, extensions, warehouses and the
admin blocks that serve them.

## Delivered work

| Project | Location |
| --- | --- |
| Consern Pharma Limited | Focal Point, Tibba |

## Authorities a project clears

| Area | Authority |
| --- | --- |
| Industrial estate | PSIEC |
| Development | GLADA |
| Fire NOC | Punjab Fire & Emergency Services |
| Electricity | PSPCL |
| Pollution | Punjab Pollution Control Board (PPCB) |

## What projects here need

- **Buildings designed around the process** — floor loads, clear heights and
  utilities matched to the machinery.
- **Extensions on running plants** — work sequenced around production.
- **Compliance-ready admin blocks** — offices, QA and canteens delivered to the
  same standard as the plant.

## Services we deliver here

[PEB buildings](/services/peb/peb-industrial-buildings-and-warehouses) ·
[Industrial construction](/services/construction/industrial-and-factory-construction) ·
[Electrical HT/LT](/services/mep/electrical-works-ht-lt) ·
[Firefighting](/services/mep/firefighting-systems) ·
[Ludhiana overview](/locations/ludhiana)

## Frequently asked questions

### What has Hagerstone delivered at Focal Point?

We have delivered a project for Consern Pharma Limited at Focal Point, Tibba, as part of our industrial and pharma work in Ludhiana.

### What kind of buildings are typical in the Focal Point estates?

Manufacturing units, warehouses and the admin blocks, canteens and offices that sit alongside them. Ludhiana's industrial base spans engineering, auto components, textiles and hosiery, and pharma — each needing robust, compliance-ready buildings.

## Sources

- [NBC 2016, Part 4](https://www.bis.gov.in/standards/national-building-code/?lang=en) — Fire and life safety — industrial occupancy
- [IS 800:2007](https://standards.bis.gov.in/website/published-standards/department-wise) — General construction in steel — code of practice

---

Source: https://hagerstone.com/estates/focal-point-ludhiana
